Long Wharf Marriott Garage

Project History
The two level underground parking garage at the Long Wharf Marriott was experiencing rebar corrosion and concrete spalling related to road salts deposited from incoming vehicles. The hotel could not simply close the entire garage for repair and leave their guests without parking. Crews would have to work quickly to repair areas and reopen them to traffic before moving on to the next area. ECB, Quick Shot and Express Set were chosen for their versatility and fast setting times. Express Set, which was used for the slab deck repairs, can be reopened to traffic one hour after application. The entire system is designed to resist deicing salts and carbonation which are common in garage settings, and is composed of single component materials, thereby reducing labor times.